Hello Experts,
i am wondering how sales order scheduling might work (or not work) in embedded TM in S/4HANA 1909. The information i find is quite confusing. I hope somebody can help me out.
- In SAP Help for (external) TM 9.6 I can read about sales order scheduling as a part of the "logistics integration"
https://help.sap.com/viewer/54cf405c9d9e4c96bf091967ea29d6a7/9.6.2/en-US/4ce1975eb0054bcbb1aa04e181ba0c23.html
- I also also see nice figures in TM110 Course:

- I learned also that the external TM 9.6 is on its end of its lifecyvle and that the strategic future lies in the embedded version inside s/4 hana.
But when i look inside the help of the embedded TM functionality which i can find here:
https://help.sap.com/viewer/e3dc5400c1cc41d1bc0ae0e7fd9aa5a2/1909.002/en-US/e50d1242ac58452cbfb50f3f66be7ee8.html
I can't find anything about any scheduling functionality towards sales orders at all or am I wrong?
- When i look inside the Customizing with SPRO inside S/4HANA 1909 i can only see setting relevant for sales order scheduling inside the integration of external TM. Does that mean that there are setting needed for an external one which is not needed and working out of the box for the internal version (which would be also logical?)

- In the corresponiding cutomizing of the cotrol key i can see more or less clear signs that this functionality is only possible with an external TM?

- I also tend to listen to the Roadmap webinars and i can find slides like this, where the sales order scheduling is part of the "Product Vision" for 2022.

To make a long story short:
What functionlaity is there for sales order scheduling / integration (wich also then influences production planning etc.) inside the current Version of SAP Transportation management embedded in S/4HANA 1909?
Many thanks in advance!
Patrick