Hi R Brahmankar

Thanks a ton for helping. I have another query in this regard. In COOIS, there is a field called "System Status". This system status takes its value from JEST (Status field) and description from Tj02T table.In TJ02T, i can see many status description. few of them are - DLV- Delivered; REL- Release for production/manufacturing; DLT- Deletion indicator; TECO- Technically completed;

My questions are:-

1. How is TECO staus from JEST/TJ02T different than that of delivery completed from AFRU? If yes, what is difference?

2. Is delivery completed from AFRU table same as DLV value in status field of JEST and TJ02T tables or different?

3. How can i see if a production order is deleted or rejected from SE16N table and field ( AFKO/AFPO/AFRU/ etc etc)? are they same as as DEL value in status field of JEST and TJ02T tables or different?

4. In earlier post around a month back, you had mentioned table AUFM. If i want to check for a production order, the manufactured item completed and reached which movement type should be used to check movement of finished manufactured goods from manufacturing plant to 3000 storage location ( 101,102 Or 261,262 or any other)? which movement type should i consider as addition to finished goods stock and which one as negative?

5. If a production order is released/ created but BoM component is not having stock, how can i check this? Do i need to use BoM Tables join to MBEW ( Inventory stock) to check material/component shortage or is there a way to see these in production order tables?

Thanks in advance,

Rahul Mishra