Skip to Content
0
May 14, 2020 at 07:17 PM

Project Cost Migration - Exchange Rate issue

113 Views

Hi,

We're using the BAPI BAPI_COSTACTPLN_POSTPRIMCOST to upload the planned cost for projects. In the current ECC system, the planned cost will have a object currency value and CO Area currency value based on the exchange rate at the time of planning. However, during migration , I am not allowed to put in both values. Instead I can either put in the object currency or the CO Area currency value. This leads to a different exchange rate being used in the new system. Is there any way to overcome this? i.e. I would like to have the same cost plan in both object currency and CO Area currency in the S/4HANA system as it is in the ECC system.

Thanks,

Kishor