Skip to Content
0
May 11, 2020 at 06:31 PM

Cost Release Issue

156 Views

Hi

We are using material ledger with price determination 3 , We reversed the standard cost with CKR1 .then Rerun the cost with CK11N. but getting Following Msg at the time of cost release

Price changes for material xxxxxxx is not possible

Message No. C+811

Diagnosis

You want to change the price or release planned prices for material xxxxxxxxx with valuation type in valuation area xxxx. You have, however, already entered actual data or performed a single-level price determination in the period concerned. The status of the material in the period is Quantities and Values Entered.

Price determination indicator 3 assumes that the standard price remains constant throughout the period, so that all movements can be valuated preliminarily with the same standard price. Therefore, you can only change the standard price at the beginning of a period (i.e. as long as no actual data was entered).

System Response

The system does not allow the price changes or the release of planned prices for this material in this period.

Procedure for System Administration

In the future, to automatically release your planned prices upon creation of new actual data you can allow dynamic price release in Customizing for Actual Costing/Material Ledger