Skip to Content

PP/DS - Procurement from alternative location w. atp check

Hello all,

i have two trasportation lane, one for another location (plant) for intercompany procurement, second one for purchasing from vendor. The first one have priority. It is possible during purchase requisition creation during mrp run, assign the first TL only if there is enough available stock in the intercompany plant? Otherwise, switch to second TL for purchasing?

Thanks in advance.

BR

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Apr 02 at 02:43 PM

    i forgot: pp/ds is the new embedded solution in S/4 hana. i do not think RBA is still available. thanks.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.