cancel
Showing results for 
Search instead for 
Did you mean: 

Change in GL Posting for Finished Goods at plant and CFA Locations

former_member205928
Participant
0 Kudos

Hi Gururs,

My client asking

Segregation of Posting of Inventory Physical Difference and Scrap of All Materials to Separate GL (Finished Goods and Packing Material). This required to segregate of cost of Scrapping and Physical (At CFA) from those manufactured and scrapped in Factory.

they want to change the GL of FCT-FG-Scrapped to another GL for CFA scrapping, so that this cost doesn’t become part of Factory Cost.

Can any one help me

Accepted Solutions (0)

Answers (0)