Skip to Content

Change in GL Posting for Finished Goods at plant and CFA Locations

Hi Gururs,

My client asking

Segregation of Posting of Inventory Physical Difference and Scrap of All Materials to Separate GL (Finished Goods and Packing Material). This required to segregate of cost of Scrapping and Physical (At CFA) from those manufactured and scrapped in Factory.

they want to change the GL of FCT-FG-Scrapped to another GL for CFA scrapping, so that this cost doesn’t become part of Factory Cost.

Can any one help me

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.