Skip to Content

Funds Management/BCS Monthly Budget Control?

Hello, Im using funds management/commitment items/ BCS to do my budget, after i planned my budget for the entire year, i generated the budget for control ledger 9H and have been able to enter values, the issue is, when i post using FB00, it checks against the entire budget (from period 1 to 12) not per period. is there a way to solve that?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Mar 23 at 12:32 PM

    Hi,

    That's normal. Budget is controlled annually (or on multi-annual basis). In order to control it on monthly level, you have to use a specific FM assignment object for it. The most suitable one is Budget Period. Search this platform: there is plenty information about this already

    Regards,

    Eli

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.