How to activate the auxiliary cost component in S4HANA 1610 (only the main cost element was used)

Dear SAP experts.

Our company has been using S4HANA 1610 version for 2-3 years in the production environment.

(There are several plant valuation areas under the company code).

The material ledger used only the main cost components, but if necessary, the (detailed) auxiliary cost components for the main cost component We want to report after define, activate, split setting.

Our company is running on version S4HANA 1610, in which case we would like to know if there are any restrictions on the following.

Question 1. Is it possible to additionally define and activate additional 'auxiliary cost component' in a system that has been in production for 2-3 years by activating only the main cost component? (In S4HANA 1610 function)

Question 2. Is there anything to consider if 'Question 1' is possible?

Thank you.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.