Skip to Content

Pushing data from CRM to ECC - Invalid date in EVERH

So there is a rate change that had happened on 03/02/2017 which got ended on 12/02/2019 due to another rate change starting 12/03/2019. Due to some reasons the product changes did not get replicated to ECC and got stuck in ECRMREPL with error "Invalid date in EVERH" since ECC ha has the contract ended on 03/01/2017.

Now, I have tried pushing the data from CRM to ECC using r3ar2 and r3ar4 but when I input the source as CRM and site as OLTP (ECC), the system still asks me to maintain the source and site name.So, this method is not working for me.

Can anyone please suggest how I can get these contract time slices replicated to ECC with the ecrmrepl error not being there?

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Feb 11 at 04:51 AM

    Hi Arijeet,

    Please look into this https://answers.sap.com/questions/12413860/invalid-date-in-everh.html

    Br,

    Keshav

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 04 at 12:43 PM

    Hi Arijeet,

    Please check the report 'ECRM_CHECK_EVERH' if it helps.

    Thanks,

    Vinod

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.