Skip to Content

How to create destination HU during adhoc WT Creation?

Hello Gurus,

How to create Destination HU automatically during adhoc warehouse task creation

screen-shot.png (61.2 kB)
Add a comment
10|10000 characters needed characters exceeded

  • Hi Amit,

    1) Create new WPT ( 9998 ).

    2) Create new WOCR ( with fliter as WPT 9998 ).

    3) Assign the new WOCR to all the storage types with activity INTL

    4) In WOCR maintain pack profile.

    5) Maintain the pick hu bin in /SCWM/SEBA ( here you need to maintain against activity INTL )

    try once & share here if it works.

Related questions

2 Answers

  • Posted on Feb 11 at 12:39 PM

    Hello,

    In my opinion it is not possible for product warehouse task.

    The HU can be automatically pointed by using of work-center 9999 in t-code /SCWM/PACK.

    You can paste your storage bins (where you want to move the product or HU)

    And use the method drag & drop

    Or just use the "repack product" tab:

    In this tab the system automatically will propose the destination HU.

    More information about creation and confirmation of WTs you can fine here:

    https://help.sap.com/doc/saphelp_scm70/7.0/en-US/ac/cccb53ad377114e10000000a174cb4/content.htm?loaded_from_frameset=true

    or here:

    https://help.sap.com/doc/saphelp_scm70/7.0/en-US/02/f7bb66616c4589a8e1115ab799e8f3/frameset.htm

    Best regards,

    Marek Kamiński


    1.png (56.9 kB)
    2.png (26.2 kB)
    3.png (18.3 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 13 at 08:58 PM

    ...not sure but worth to give it a try -

    create a new WPT and a new WOCR. Assign packing profile to WOCR which creates an HU during WO creation. Assign the WOCR to the WPT and observe what's happening (WOCR might create a destination HU for you).

    Add a comment
    10|10000 characters needed characters exceeded

    • ...one more thing. I think you need to sort the source bins for activity INTL and assign a start bin to the activitiy area. As far as I remember EWM will create the HU on the startbin (remember to set the HU creation flags in the packing profile) and upon WO confirmation a HU WT will be created with the same destination as the product WT. Product WT will get the new HU as destination.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.