Hi All,
I have been assigned the task of copying our production R/3 system into a new SAP system on the same machine. We have Oracle on AIX. Basically, the task is to create a new SAP system by setting up new filesystems according to the ones on the production system, and then basically restore the production database into the new system.
I know how to do the database restore part, but i have never done a system copy like this. So, if someone has experience with this please let me know the steps i need to do on the SAP side, before or after the restore.
Do i have to copy the SAP filesystems over to the new system and change something? Please suggest.
Thanks in advance
Cyrus