Skip to Content
0
Jan 29, 2020 at 10:03 AM

Issue with costed status

51 Views Last edit Jan 29, 2020 at 10:04 AM 2 rev

When user creating a debit memo request with reference to the contract system throws an error

In the old contracts for the same material we don't have costed status, As this is a system status need some info from where this to be costed status is coming from

In both contracts status profile is same

Attachments

costed-status.png (154.1 kB)
costed-2-status.png (176.6 kB)
status-cost.png (66.4 kB)