Skip to Content
0
Jan 14, 2020 at 07:34 AM

Scrap part of Assembly in QM

141 Views

Hi Expert,

We have a scenario like Material A + Material B = Assembly Material C and GR inspection inactivated for Material C.

Once the production Order is confirmed QI stock will be increased in Material C.

During the inspection identified that Material C is scrap (But either Material A or Material B can be used again)

What is the best practice to use Material A or B to use again?

Thaks in Advance

Ashok M