Skip to Content
0
Nov 18, 2019 at 07:44 AM

Previous/current and Future period in costing2 tab MM03

124 Views Last edit Nov 18, 2019 at 09:10 AM 2 rev

Hi All,

Is it possible to identify at table level, which is the current period of Cost estimation which we can see in MM03?

I need to pick only Current cost estimation for my reporting purpose, but when i checked KEKO, i can see there are multiple valid from and to dates, which i assume consists of previous,current and future estimations.

I need the highlighted period data and need to identify the same at table level.

Attachments

cost-estm.png (16.5 kB)