Information message Date adjust. level incorrect: Plant XXXX/ord.type PE / prod.sched in MF50

Hi All,

on MF50 initial screen getting message like Date adjust. level incorrect: Plant XXXX /ord.type PE / prod.sched,

I have maintained OPU5 setting also maintained proper prod version and scheduling parameter in input parameter of MF50.

Finite capacity is ticked in workcenter, shifts are also maintained.

In dev not getting this message but in quality it is there what setting I am missing.please guide

Regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Nov 06, 2019 at 06:58 AM

    Hello,

    Please compare setting of OS80 and OSP1 in quality and development system,

    Also check OPU5 setting for adjust date too.

    For message REMPT301 please refer this old discussion

    Problem in REM Planning table and SAP consulting note 178525 - MF50: Explanation --> scheduling

    Best Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.