Dear experts,
Working in HANA with embedded EWM, I am setting up Material staging to PSA. SAP documentation indicates: "...the system proposes a quantity to stage. This can be the entire quantity required by production or a smaller quantity to stage...". With smaller quantity to stage it is clear. But how to set up "entire qty required by production"? I understand it so, that staging must create WT for the component quantity from PMR. we have PO with component 1 and 11 PC, so I need to stage 11PC. tomorrow the next PO is bigger, and I need to stage 18 PC.
Still in transaction /SCWM/PSASTAGE I can set up only staging with either quantity - based or pack-spec based calculation. But in this case /SCWM/STAGE generates WT with always the fixed quantity, dependless on how much my PO-PMR needs. If I change choose "no quantity calculation" in /SCWM/PSASTAGE, the system generates 0 tasks. So question is how to stage qty from PMR in sap-standard (ie. without BaDi BAdI:-Data-Collection-for-Staging-for-Production). Or do I understand SAP-wording "This can be the entire quantity required by production" in somehow wrong way?
Thanks,
Pavlo.