on 11-01-2019 2:46 PM
Hello,
In our system, we have 1 BOM with 1 Router matched to 1 Production Version.
We want to modify the data on the Routers. However, a cost comparison is needed before activating the new routers.
If the routers were entered with a future date (1/1/2020),Is it possible to run a cost roll for 2020 data?
Would it pick up the new router changes and the existing BOM?
Do I need to create a new Production Version and link the New Router to the BOM?
Please provide direction on how to best approach this scenerio.
Hi,
If you change any thing a BOM or Routing, then you have to create a new production version with validity. Then only you can compare it old version.
Regards,
Mukthar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.