I'm preparing to work with changing some of the standard hierarchy in OKEON in SAP ECC 6.0. I know what structure is desired and the validity date/date of the change should be 2020.01.01. Do I need to add the date anywhere else than in "as of" to avoid changing the structure immediately and make sure that the change is active from the desired date?