resource with storage characteristics

carlos_perez8
Participant
0 Kudos

Hi all

We have the following scenario:

Semifinished line to feed an intemediate tank and then to feed Finished line.

We need to limit the max quantity in the intermediate tank. So do I need to create the semifinished line as storage resource or do I need the semifinished lined plus the storage tank?

If the second I assume I need to add to the recipe as a phase?

Thanks in advance

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Yes resource should with with storage characteristics and it need to add in recipe phase along with storage location.

In transaction CRC1 you have to assign a storage location to the resource and saved it . Then system then transferred the resource to Advanced Planning, but in transaction /SAPAPO/RES01 the field 'Sublocation'

For more details, please refer SAP consulting note 498223 - Planning on resources with storage characteristics

Also refer this discussion on it,

Tank planning

Best Regards,

R.Brahmankar

Answers (3)

Answers (3)

carlos_perez8
Participant
0 Kudos

Thanks

But I get the following error when creating the order:

e

And if I view PDS maint these fields are missing not editable for the container resource:

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Do you have any setup activity here?

Check may be the resource is assigned as Multi resource where as capacity is maintained as 1.

A container resource is a multi resource or multi-mixed resource with storage characteristics.

Also execute transaction /SAPAPO/REST02 with option Save selected Resource liveCache for the affected Resource, to ensure it is successfully saved in the liveCache.

Best Regards,

R.Brahmankar

carlos_perez8
Participant
0 Kudos

Thanks so much

So the recipe should have one phase for production and other phase for storage resource?

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Yes better to have it as separate phases.

Best Regards,

R.Brahmankar

carlos_perez8
Participant
0 Kudos

Thanks so much

The resource category has to be S (Warehouse)?and where to assign storage location in CRC1?

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

In basis data tab you have an option to assign the storage location.

You can use machine category too, or create resource for category 0014 ( Storage resource ) where storage location is mandatory in standard SAP.

Best Regards,

R.Brahmankar