Skip to Content

Migration of Work Manager from ECC to S/4 Hana

Hello Experts,

We are using Work Manager 6.3 application for Windows. SMP 3.0 SP 12. and the back end system is SAP ECC 7.5. Our client is planning upgrading the SAP system to S/4 Hana. I would like to know the steps to be carried out specific to the Work Manager application for the upgrade.

Thanks in advance,

Sujit

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.