Skip to Content

Create Production Order with no Standard cost estimate

Hi Experts,

We know that standard cost estimate is normally necessary when creating production orders. But for this material, we setup the Costing view to not cost it, so it should not give us an error when we are creating an order for this material that does not have standard cost estimate. But the system is still giving us an error that the Std cost estimate is missing. Is there anything I missed here so that I could create a production order without activating the standard cost estimate of the material?

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.