Hi,
how can i determinate automatically the inspection plan and the sampl calculation (after a good entry) in inspection lot ?
at the moment, i have flagged "chack with plan" and "check with characteristic" in Quality Management view of material wich i've entered.
But to acquire the results i must manually determinate plan and sample in the inspection lot
thanks