Skip to Content

C4C // Trigger calculated field processing

Hi experts,

we created a calculated field in the Sales Quote with KUT. The Calculation only occurs, if we make changes in the Quote. After that, the field is filled. Is there any possibility to trigger the calculation for the field in Background for specific Quotes, without manually save them? For Example a background process or something similar.

Thanks for advice and best regards.

Best regards,
Michael

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Oct 22, 2019 at 09:24 PM

    Hi,

    Not sure if this is a ideal solution but in our project we used following approach many times:

    1. A KUT Indicator field "ZUpdateIndicator" is craeted

    2. Enable it for Data Work Bench via odata.

    3. Once it is done then we export all the relevant data based on the business requirement using DWB

    4. Mark the value of "ZUpdateIndicator" as TRUE. In such case if a logic is written in PDI or via workflow then correcpoding field value is updated.

    5. IFor future senarios, reset the value of KUT field "ZUpdateIndicator" using a new workflow rule which will again toggel the value.

    Thanks

    Saurabh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.