Solman Process mamagement change history and change mamagement

Dear experts,

After we configrate the process menegement in our solution management system. when our consultant maintain our business process management in SOLDOC, after we release changes, we can find the release content in the Production blanch. We have some question about this.

1.How do we control user can only see the production blanch, and some user can see the IMPORT blanch and change the process?

2.when we change our process, can we create some document like change document to follow the change?

3.Is there any detailed change history to show what do we change in our process each time?

4.When we create a change document to change the program A, we can add the specific element of our process, but how do we know we assign the right element that include program A.

Please hlep us with these question, and if there are any other example about how to manage our process, please let us know.

Best Regards

Kevin

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.