cancel
Showing results for 
Search instead for 
Did you mean: 

ROS for rework order

former_member600146
Participant
0 Kudos

Dear Experts,

I am trying to create a rework production order without material (CO07) . I have a ROS with correct validity and lot range, but when I am creating the order it is not able to find the ROS. If I assign manually also , still it is not taking it. My requirement is to take the ROS automatically. Please check the screenshots attached and let me know if I have made any mistake in SPRO.

order-dep-parameter.png ros.png order1.png order2.png

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

I think this could be due to Selection ID 01 in OPL8 setting which is checking for N type of task list.

In OPJF create new Selection ID with task list type = S Reference Operation Set

Assign it in OPL8 and then create new order and check it.

Best Regards,

R.Brahmankar

Answers (1)

Answers (1)

former_member600146
Participant
0 Kudos

Dear Brahmankar,

Thank you. It is working now. But the pop up box to search ROS is still appearing. Can we select it automatically as i have only one ROS for the plant.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Good to know that, it is working, reference operation set is not specific to material, it maintain at plant level. So it not possible to automatic selection. Also rework order is also without material. You don't know what are operations need to be reworked,

You can have only one ROS at plant level and assign that during order creation.

Best Regards,

R.Brahmankar