Hello experts,
How can I define or maintain the time profiles to use Fiori App Production Scheduling Board in PP/DS?
There is only one available Time Profile (SAP001) and there is only one resource to select with this time profile, although i have defined more 2 single and 1 production line resources on the system. How can i assign the time profil SAP001 to other Ressources?
Thanks and Regards
Levent