Sep 06, 2019 at 07:55 AM

Discontinuation in BOM and product costing CK11n

60 Views

HI ,

I wanted ask about case for which there is no good solution on other posts.

in BOM we are using discontinaution solution.

Material A is replaced by Material B (follow-up) material when stock of material A is finished.

All is working very good untill we run CK11n and costing. Even discontiuation date is in the past in CK11n always material A is calculated and B is never visible.

Bussines wasnt to calculate for costing materia B as it will be main material after material A will be out of stock soon.

What is the solution for such reasonable logic ?

BR Rafal