Skip to Content
0
Aug 14, 2019 at 02:10 PM

One Inspection lot for Multiple goods receipt with QM and EWM Integration

1369 Views

Hi All ,

Can any one help for QM-EWM integration issue ??

Let me brief about the requirement ,,,,

With my current project - ECC(S4/1709 ) and EWM(9.5) are different systems.

Requirement is to have one Inspection lot for one batch but with multiple goods receipt for the process order .

Material 1234-bulk which is having 1000 L for process order and having batch B1.

For first GR which is 150 L and system has created one inspection lot 170000001 with inspection document for batch B1.

Now the requirement is .....for second GR which is 200 L and system should not generate another Inspection lot for the same batch B1 .

With EWM it is inspection type 17 and its required control Inspection lot .

Can any one suggest or guide how to manage this requirement ??

shekhar