cancel
Showing results for 
Search instead for 
Did you mean: 

Single MRPc Multiple Production Version & Using Dept.

0 Kudos

Hello,

I have 1 MRPc or manufacturing dept. which makes a part for 3 manufacturing depts. I have 3 Production versions set up (A001, A002, A003), but i'm having trouble getting the production orders to create based on which dept needs parts. (For example: 049, 012, and 031 all use the parts. if 049 has 5 pcs on hand but a requirement of 50, it should create a planned order for 45 pcs on A002 which is set with 049 as the Receiv. Location. but it is always selecting A001.)

Accepted Solutions (0)

Answers (0)