Hi,
Could anyone let me know how can i check in R/3 side if 0material delta laoding getting 0 record?
What I mean is that: we have a process chain loading all master data, including "0materail" Material Number(0MATERIAL_ATTR), and Product number(0MATERIAL_TEXT).
and it runs once a week.
this week, I noticed that there is both 0 records has been laoded from R/3 to BW for both (0MATERIAL_ATTR) and (0MATERIAL_TEXT) delta load. while teh other master data load runs normal, get records as normal.
But i am not sure how to check in R/3 side, to ensure whether there are some new records created during this week or not.
which transctiion and table i should check.
Please advice,
Ping