Skip to Content
avatar image
Former Member

Upgrading from PO7.4 to PO 7.5 NW BPM redeploy ??

Currently NWDI isnt configured in our landscape so NW BPM are exported as products and saved in a CVS/DMS.

Now we are upgrading I'm trying to use NWDS 7.5 - but there is no Composite Designer view to import the product into for deployment.

How do I export a NW BPM 7.4 (NWDS 7.31) and import the same process into NWDS 7.5 so that it can be adjusted/fixed then redeployed to 7.5.

I have both versions of NWDS installed and I have the products in CVS that I can potentially import them all into 7.31 and re-export them in the correct way to import into 7.5...

Thoughts ?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Feb 13, 2017 at 05:09 AM

    Will importing into NWDI from 7.4 then deploying to a 7.5 stack work through NWDI ?

    Add comment
    10|10000 characters needed characters exceeded