cancel
Showing results for 
Search instead for 
Did you mean: 

Next inspection date

junaidalam
Advisor
Advisor
0 Kudos

Dear All:

We are on SAP S/4 HANA 1610. The next inspection date is not getting populated in Batch Master after the GR and UD. Can any one please help me. I have Inspection type 09 in material master. Inteval days set as 365, Period in. Rem. Shelf Life 12M Total shelf life 36M. No date is appearing in batcj master for Next inspection date.

Junaid

Accepted Solutions (0)

Answers (0)