Skip to Content
1
Former Member
Jul 13, 2015 at 08:24 PM

How do we know if CPQ initial load is ok?

251 Views

Hello all,

We have configured SAP CPQ with the powertools accelerator.

The CPQ initial load was triggered from hMC and it says "Initial load completed successfully"

How do we verified the data that was loaded correctly??

What should be the next steps?