MF60. Open Transfer requirements for PSA total stock

former_member601182
Participant
0 Kudos

Dear all

is there a way to setup MF60 so that Transfer Requirements are taken into account for the Production Supply Area stock calculation. For the scenario of Release order parts.

By default, its opened Transfer Order is taken into account and I'm looking for the way to include TR too.

Thanks in advance,

BR, Andrey.

Accepted Solutions (1)

Accepted Solutions (1)

former_member244427
Active Contributor
0 Kudos

Hello,

Check if this note is relevant for you

932132 - MF60 for WM release order parts - open TR quantity incorrect

You use Transaction MF60 to execute material staging for Warehouse Management (WM) release order parts. However, the system does not take open transfer requirements for the production storage bin into account. The system creates a new transport requirement every time you execute Transaction MF60.

Regards,

Abhishek Rai

Answers (2)

Answers (2)

former_member601182
Participant
0 Kudos

Hello R.Brahmankar, Abhishek Rai

many thanks for your input. I've also found the following OSS notes relevant:

2470875 - MF60 - quantity already staged not displayed correctly if staging of release order parts

932132 - MF60 for WM release order parts - open TR quantity incorrect

And after implementing these notes opened (existing) Transfer Requirements were taken into account during material staging.

Thanks!

BR, Andrey.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

You use Transaction LP12 or MF60 to perform material staging of release order parts.

In this case, a transfer requirement (TR) is created. As long as this TR is open, the requested quantity is reduced correctly and the open TR quantity The production storage location is managed using WM.

Make sure the production supply area (PSA) is assigned to this storage location. The TR is created with a storage location.

Best Regards,

R.Brahmankar