cancel
Showing results for 
Search instead for 
Did you mean: 

REPLACE/DELETE material in mass level from production orders

former_member751184
Discoverer
0 Kudos

is there any option to replace/delete A to B in mass level in all production orders ? in current scenario, i change 1 by 1 in all PROs. if i have to change in 100 Production Orders, i use CO02 and replace it 1 by 1 which is very time taking job.

Accepted Solutions (0)

Answers (1)

Answers (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

There is no tool in standard SAP to replace to components from production orders in mass.

You can use LSMW or BAPI/BDC program for it.

Or you can do the changes in BOM and then perform read PP master data.

Also there is no mass tool for read PP master data.

Best Regards,

R.Brahmankar

former_member751184
Discoverer
0 Kudos

yeah, i know tool of Read PP master but that need to do 1 by 1 for mass changes. thats why i need a tool to replace in mass level in case of ECN.

rupesh_brahmankar3
Active Contributor
0 Kudos

You can use LSMW for that.