Skip to Content

How to create consolidation and delivery routes for CHARM with QAS, PRD are virtual system.

Hi Team,

We are creating the CHARM.Our landscape is 3 system.Solman 7.2 SP 7

DEV--> real system

QAS and PRD -->Virtual systems

Following the below link.

https://wiki.scn.sap.com/wiki/display/SM/How+to+create+a+virtual+system+in+SAP+Solution+Manager+7.2

I am unable to create routes with consolidation and delivery(I am basis beginner ) due to this i am facing the issue in Change Cycle creation.

Could you please provide step by step how to create routes.

Thanks in advance.

Best Regards,

Vijaya

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Mar 30 at 07:55 AM

    Hi VIjaya,

    You can follow these steps -

    1. Go to Tx. STMS and Open Transport Route

    2. Open in change mode. Open Configuration > Standard Configuration > Three Systems in Group

    3. Mention your Dev , Qua and Production SIDs

    4. Save

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.