Skip to Content

Unlimited over delivery check box is reset automatically when i change the PO quantity.

Hello all,

I have created a PR with 15 Quantity and converted the full 15 quantity into a Purchase order. When PO is created unlimited check box is selected by default. Later in ME22N i change the PO quantity manually into 10. In this case Unlimited check box in the delivery tab is reset automatically. Could you please tell me what could be the reason for reset is this system driven settings or standard SAP functionality?

Thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jul 04, 2019 at 08:12 AM

    Unlimited flag could be populated automatically from info record, but upon any change this should not be cleared. Please refer SAP note 1644491 - unlimited overdelivery flag is cleared with price change and check is it resolve your problem.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.