Skip to Content

Mass ticket confirmation of production orders with cohv

What is the difference between CO11n and Cohv for mass time ticket of production orders.

i have to put in time tickt of too many production orders and dont have access to co15.

can i continue using cohv instead of co11n

need an urgent reply from the comunity.

thanks and regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jun 28, 2019 at 03:22 PM

    Hello

    Please read the SAP Help to understand how the OCHV confirmation works:

    https://help.sap.com/doc/7205b753128eb44ce10000000a174cb4/3.6/en-US/3100b753128eb44ce10000000a174cb4.html

    Regards,
    Caetano

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.