Skip to Content

HANA NDSO to NDSO (Delta)

Hi Expert,

I find the case about Delta request from NDSO1 (Change Log) to NDSO2 do not sequence the "Technical Record No." (NDSO1).

I check the NDSO2 (Change Log) then I see the Change Log record from NDO1 is loaded to NDSO2 in wrong sequence .. see in Picture1.

I also attach the mapping to inbound table of NDSO2 .. see in Picture2.

The Data Warehouse Foundation version is SP03.

Is there any IDEAs to solved this case?

Thank you

Ditthanan P.

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.