cancel
Showing results for 
Search instead for 
Did you mean: 

EWM Production supply delivery is created despite of requested qty is zero in manufacturing order

0 Kudos

HI Experts,

We are using embedded EWM in S4 Hana.

The warehouse storage location (say 1000) and production supply storage location (2000)both are EWM managed.(two separate EWM warehouses say W001- Warehouse and W002- production supply).

The manufacturing order triggers outbound delivery for warehouse W001 to supply the goods whenever staging is triggered.

Scenario:

1.The material (say 1000001) is available in sufficient qty (say 100) in production supply storage location 2000 (warehouse W002)

2. When a new manufacturing order is created, the system calculates "requested qty= 0" and "requirement qty= 10" for material 1000001. This is correct, because production supply storage location already has sufficient quantity fulfilling this requirement.

3. However, system still creates outbound delivery for production staging with qty 10. THis is incorrect and is not required.

Kindly suggest/provide your views to correct this behavior.

Best regards,

MM

Accepted Solutions (0)

Answers (4)

Answers (4)

Ajit_Routray
Active Contributor
0 Kudos

Hi Michael Manoj Madtha,

P313- Always create Outbound Delivery as per the Standard Design of Pick Part .

My understanding of Mapping P313: Usually for MTO Scenario- Components are always staged per Customer/Order-Link is established between Outbound and Process/Production Order

Did you try R313 ? Run MF60 explicitly to sum up all quantity of different order

Other Option is Enhancement: Assuming below BADI

Enhancment spot: LE_SHP_DELIVERY_PROC

Method:SAVE_DOCUMENT_PREPARE-Validate quantity check with error message/Stop creation of Delivery

Kind Regards,

Ajit

Ajit_Routray
Active Contributor
0 Kudos

Hi Michael Manoj Madtha,

I am sorry for confusion- I meant for Staging Type Example Pick Part, Create, Release Order...etc - Field is Material Staging Indicator for Production Supply

Question: Are you mapping your Process as per the link https://help.sap.com/viewer/9832125c23154a179bfa1784cdc9577a/1809.002/en-US/e1c091c8bfaf4b6db4fef327... ?

I think you should try release Order/ Collective Order Staging in PMR. Please read below documentations.

Source: https://help.sap.com/viewer/9832125c23154a179bfa1784cdc9577a/1809.002/en-US/97e2ff13b2ac487098539805...

https://help.sap.com/viewer/9832125c23154a179bfa1784cdc9577a/1809.002/en-US/ae9beb535cbb5d1ee1000000...

Kind Regards,

Ajit

0 Kudos

Hi Ajit,

We have mapped P313 for our business.

We want the system to look for stock in production storage location first and then create delivery for deficit qty for supplying storage location.

Best regards,

MM

0 Kudos

HI Ajit,

Thanks for the response.

The control cycle is setup correctly. I am not sure what field in control cycle influences the availability check at storage location. Please guide if there is anything to check in control check.

Best regards,

MM.

Ajit_Routray
Active Contributor
0 Kudos

Hi MM,

Could you please check Cycle Control ? Example Material Staging Type

https://help.sap.com/doc/9f3cbf53d25ab64ce10000000a174cb4/1511%20001/en-US/0090c95360267214e10000000...

Kind Regards,

Ajit