Hi All,

SAP MDG 9.0 version.

I have created Cost Center Group Hierarchy (CCH1P1), Cost Center Group with hierarchy assignment (CCG1P2).

Now, I am trying to create a Cost Center and assign to the hierarchy created above, using the CR Type CCT1P2. But it is giving below error:

Message no. USMDZ3263

Cost Center CO01/CO01CC1 Field "Cost Center": Cost center not assigned to standard hier. CO01 in controlling area

Diagnosis The cost center must be assigned to the standard hierarchy for the corresponding controlling area.

Procedure To assign the cost center to the standard hierarchy, you need to choose the entity type cost center group and the relevant controlling area in mass processing. This takes you into hierarchy maintenance where you can assign the cost center to the standard hierarchy. If the standard hierarchy does not appear in the list of hierarchies, it still has to be created. You can do this using single maintenance or from hierarchy maintenance.

This is confusing. If I have to use mass processing CR, then what is the use of the CR Type CCT1P2?

Please guide.

Thanks,

Priti