Why multiple MRP view I. E. MRP1, mrp2, mrp3, and MRP3 in sap material master. Please direct me some document?

Accepted Solutions (0)

Answers (2)

Answers (2)

ankurch
Active Contributor

Hi Kamran,

If you can open you can see there are a lot of information has to be saved in those tabs requires by different modules i.e. - MM, PP, PM

lingaiahvanam
Active Contributor
0 Kudos

Hi,

You will get a lot of information via google search.

Why multiple MRP view I. E. MRP1, mrp2, mrp3, and MRP3 in sap material master?

In short, SAP divided MRP parameters into different sections to easily understand and maintain the relevant options to drive material requirements planning.

https://www.guru99.com/material-master-views-ultimate-guide-2.html#C8

Best Regards,

Lingaiah