Hi experts,

I would like to ask how could I connect in LP1 the LEIH/VERP packaging with own material number with the required packed material (FERT).

Now I see the requirements list for the FERT, but for the packaging shows nothing.

Thank you for your help

Accepted Solutions (0)

Answers (1)

Answers (1)

Prasoon
Active Contributor
0 Kudos

Hi,

Is the packing material added to BOM of FG?

Regards,

0 Kudos

Hi PRASOON AK,

yes, I´ve added the packing material tom BOM in rate 1FG to 1 Packaging, but it still doesn´t work.

Moreover I need the rate 60 pcs of FG to 1 packaging.


Do you have any idea for it?