Dear Experts,
We have a requirement as below. Kindly suggest your opinions.
1. We are transporting goods from one shipping point to multiple locations through a single vehicle.
2. Suppose we have transferring goods from location L1 -> L2 -> L3 -> L4.
3. Route are created for each point, like L1->L2= R1 (Route), L1->L3 =R2 ans L1-> L4=R3 (Route) etc.
4. There are separate delivery document for each route like from L1 -> L2 delivery D1, L1 -> L3 delivery D2 and L1 -> L4 delivery D3.
5. Each delivery has its own route.
6. All delivery loaded in a single truck.
7. Now, I created collective shipment and included all deliveries in a shipment. Entered R3 route which is longest and only one stage is determined in shipment document.
Can you please suggest, how we can assign stages for every delivery document? Or how we can map this process? It will be better if you provide the screen shots.
Regards,
Rahul