Skip to Content

Wrong result by executing allocation process in SAP analytics cloud

Hi Friends,

We would like to use executing allocation in planning story. The process is the below.

1. uploaded data with excel file to the Model.

2. created allocation process and step.

3. Set value to unassigned field.

4. Execute allocation with allocation process which I created above.

As result, there is remaining value into unassigned filed, thus all value could not allocate to target dimension. If I create new version and delete existed value, I succeed to allocating(unassigned value became empty)

If someone occurred similar problem and have how to resolve, please let me know.

Best regards,

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.