on 05-23-2019 1:22 PM
Hi Team,
We are facing issue of TU creation after loading instructions triggered successfully. We are not able to see TU in EWM system as well as in SMQ2 or SLG1. Please provide inputs with solution to fix this.
Thanks
Hi,
at the moment we are trying the variant with Process Integration (PI). But not sure what has to be set up in TM in order to make sure the Loading Appointment Message in sent to the XI-Interface in the first step. We only have maintained the /SCMTMS/TOR Output Profile for the railunit type. Messages of Profile /SCMTMS/TOR are all activated, but maybe additional settings have to be made.
BR
Gabriel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, I'm in S4 1709 with TM and we are adding EWM basic license. I'm facing an issue because in EWM is expecting the outbound delivery to be assigned to a TU. For what I know, TU cannot be used with basic license. Is there a way to work with TM and without TU in EWM side?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi All,
Any body know how to integrate freight booking from embedded TM to EWM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Freight Booking is not supported in the Shipper scenario (with ERP delivery). See SAP Note 1984252: "Booking documents are not supported in loading appointment messages." One workaround is to create a pickup stage to the Freight Booking. This stage is detected as Freight Order, so it is part of the supported functionality (with restrictions).
Hi Prashant, Can you detail the solution to fix the problem.
Hi Baliant, Did you manage to get any resolution. Please share if any.
Thanks, Malay
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
TU got created successfully now. We checked further processing in EWM and found scenario working fine.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amrita Bose
If EWM-TM is in same system, then please read the step by step pictorial guide KBA OSS Note.
2933925 - Setup embedded TM- embedded EWM Integration via Soamanager (WSRM)
https://www.linkedin.com/feed/update/urn:li:activity:6681857571541790721/
Kind Regards,
Ajit
Hello,
we are using S/4HANA 1809 with embedded TM and EWM.
The goal is to sent a railcar unit with assinged freight units from TM to EWM in order to create a Transportation Unit in EWM with assigned outbound deliveries.
After the triggering the Sending of loading instruction for the railcar unit following status is updated:
Transmission-to-EWM StatusTransmission-to-EWM Status: *Shipping Point* ( ) Sent
But as mentioned in previous comments no Transportation Unit is created in EWM
and we can not find any error message in SLG1 or XI-Monitor.
Do you have any Advice?
BR
Gabriel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.