Step by Step PP scenerios in S4 HANA

Hello Gurus

My current role requires me to do all configurations related to PP in a S4 HANA sandbox and prepare end to end business scenarios for anything Discrete industry / REM .

Can you please list some of the possible standard Business Scenarios that can be showcase - and

1.) step by step of configuration .

2.) Step by Step to prepare test case .

Many Thanks in Advance

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

5 Answers

  • May 28 at 05:29 AM

    Hi

    Follow the below attached link, where you find the complete Best Practices Documentation.
    You can find the Configuration of the relevant Building Blocks & also the Test Cases for the Business Scenarios, with steps by step & with the Test data.
    (**Note: You can down load the Test Cases, only if you have valid S User Id, else, may not be possible to view/down load the Test Scripts of the Business scenarios)

    Please let me know, for any further assistance required. Thanks & Regards : Raja

    https://rapid.sap.com/bp/#/browse/categories/sap_s%254hana/areas/on-premise/packageversions/BP_OP_ENTPR

    Add comment
    10|10000 characters needed characters exceeded

  • May 28 at 12:08 PM

    Hi
    For more detailed info on the Complete Business Processes, please follow the below link, which will direct you to SAP Best Practices Explorer

    https://rapid.sap.com/bp/#/browse/categories/sap_s%254hana/areas/on-premise/packageversions/BP_OP_ENTPR/S4HANA/1709/US/4/EN/scopeitems/BJE

    Login, with S User id & Password, to get the Complete access for the Documentation Help & also can down Load that required info/Building Blocks.
    This is not the single Document/file, there many are more documents/Building Blocks, which you need to take a look, as per the Business Requirement.

    Hope, this Helps. Thanks & Regards : Raja


    ahqpl.png (68.8 kB)
    Add comment
    10|10000 characters needed characters exceeded

  • May 28 at 01:30 PM

    Hi,

    The same steps needs to be followed as SAP PP implementation. When coming to S4 HANA, You have to keep in mind that production needs to be created for PPDS master data.

    SAP PP is known as S4 HANA PPDS in HANA system. Detailed scheduling needs to be enabled in material master and work center.

    There are few additional master data needs to be created in S4 HANA system. PDS, iPPE etc,.

    Please refer below link

    https://wiki.scn.sap.com/wiki/display/SCM/APO-PPDS

    https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

    Regards

    Mahe

    Add comment
    10|10000 characters needed characters exceeded

  • May 31 at 08:45 AM

    Hi
    Please take a look of this attached Link, which gives you complete Demo Scenarios in
    S/4 HANA 1809 System

    https://www.sap.com/documents/2018/12/52052e42-2e7d-0010-87a3-c30de2ffd8ff.html

    Thanks & Regards : Raja