Skip to Content
0
May 13, 2019 at 08:20 AM

GRC Migration from 10.1 to 12 with new system installation / pending workflows

290 Views

Hi there,

we are currently performing a "real" migration from GRC10.1 to GRC12. Due to technical dependencies (certain addons/components) it is not possible to upgrade the existing GRC10.1 box to GRC12; so the only way is to create a fresh GRC12 box and migrate the data from the legacy system GRC10.1

Most of the Application/Master data can be migrated manually as there are several options for up/download available, Also the customzing can be collected with merging the imported transports, but so far I don't know how to handle pending workflows (FF log review, open access requests, etc) in such a case.

(I know there were options offered by SAP during GRC5.X to GRC10.x migrations) but for a GRC10.1 system I didn't find anything simlar.

Does anyone know a way to handle that kind of data.

thank you

Johannes