IBP Demand - Reconciliation of 2 TS key figures at different planning levels in same planning view

sberger1
Explorer
0 Kudos

Dear community,

I am currently brainstorming about a specific problem not being sure if it can modeled in SAP IBP Demand.

Background:

Sales is planning their demand at PRODLOCCUST (product, location, customer) level which afterwards is supposed to be reconciled against a time series based rough cut capacity key figure. However this capacity key figure can't be maintained at PRODLOCCUST level but at a higher level of LOCRES (location, resource). The compound attribute LOCPROD would also be enhanced with the attribute RES (resource). So actually there is direct connection between LOCPROD and resource.

Is it possible to display both key figures in the same planning view indicating that it's stored at a higher level or will it automatically be shown, disagreggated on PRODLOCCUST?

best regards, Stefan

Accepted Solutions (1)

Accepted Solutions (1)

former_member242371
Contributor
0 Kudos

Hi Stefan,

I don't see any issue in reconciling consensus demand at Location-resource level if resource it added in the planning level. The planning view will display aggregated value iff you select these two attributes only.

Thanks,

Rohit

Answers (1)

Answers (1)

peter_casper
Contributor
0 Kudos

How would the capacity key figure behave? Would it also show the maintained capacity at location / resource at article level although the planning base level for the capacity TS is at location / resource?

Cheers, Peter