cancel
Showing results for 
Search instead for 
Did you mean: 

Auto Batch Change of FG material present at a Location during date change

0 Kudos

During Confirmation of Order FG is produced and FG stock is generated in date wise batch. Suppose if today we have done confirmation of 1000 Pieces then this will be shown in 19042019 batch. I want when date will change at 12:00 AM then this complete material batch will be changed to 20042019. i want a auto job for this.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Could you please elaborate the business requirement here?

Why do you want to change batch date every day?

Do you want to change the batch number of date of manufacturing or GR in batch ?

Best Regards,

R.Brahmankar

0 Kudos

Dear Brahmankar,

We have integrated our MES with SAP. So goods produced in MES are send to SAP. Details send by MES to SAP is Order No., BIN Number, QTY, BATCH(Here batch is the current date) and stock of FG build at PKG1 location. Now at last stage of MES this stock is moved from one location to other by passing information from MES to SAP. So suppose if i make some material at 11:30PM today then material will show in 20042019 batch and PKG1 location. When this material will reach MES last stage then date will be changed and MES will request to move material from PKG1 to FG01 location from 21042019 batch.

That is why i want one auto job for changing the batch of FG material or you can say to move the material from last date batch to current date batch.

Hope this clarifies my requirement.

Accepted Solutions (0)

Answers (0)